CHP plant construction - foundations.
|
Client: Introl-Energomontaż sp. z o.o. - Chorzów |
Completion: 09.2019-06.2020 |
Extension of a social building, including technical infrastructure.
|
Client: REMONDIS Bydgoszcz Sp. z o.o. - Bydgoszcz |
Completion: 03.2019-01.2020 |
Extension of the [the production plant] Zakład Produkcyjny "Marma Polskie Folie”
|
Client: Marma Polskie Folie Sp. z o.o. - Warszawa |
Completion: 03.2019-02.2020 |
Conversion of a non-utility building for the purpose of a production and warehouse facilities, construction of a social and office building
|
Client: LIS Polska Sp. z o.o. - Legnica |
Completion: 01.2019-07.2020 |
Modernisation of the shop floor H15.
|
Client: COBI FACTORY SA - Mielec |
Completion: 01.2019-03.2019 |
Construction of the production plant with a high bay warehouse and an office and employee amenities part.
|
Client: MEBLE POLSKIE - Zamość |
Completion: 07.2018-06.2019 |
Extension and alteration of the production and administrative building with auxiliary infrastructure for MTU Aero Engines Polska.
|
Client: Adamietz Sp. z o.o. - Strzelce Opolskie |
Completion: 12.2018-07.2019 |
Etension, vertical enlargement and alteration of building structures of [the production plant] Zakład Produkcyjny "Marma Polskie Folie"
|
Client: Marma Polskie Folie Sp. z o.o. - Warszawa |
Completion: 11.2018-04.2019 |
Construction of the warehouse no. 1
|
Client: OKNA DEBOW - Przeworsk |
Completion: 10,2018-02,2019 |
Addition to production hall - building works.
|
Client: Marma Polskie Folie Sp. z o.o. - Warszawa |
Completion: 02.2018-08.2018 |
Alteration of the front of the drying tower no. 1 at the premises of LIS Sp. z o.o.
|
Client: LIS Polska Sp. z o.o. - Legnica |
Completion: 06.2018-11.2018 |
Alteration of a part of the production building for the needs of the gum arabic plant at the premises of LIS Sp. z o.o.
|
Client: LIS Polska Sp. z o.o. - Legnica |
Completion: 02.2018-08.2018 |
An office and administration building with employee amenities called Research and Development Centre.
|
Client: INGLOT Sp. z o.o. - Przemyśl |
Completion: 09.2017-09.2018 |
Service and warehouse building with indoor building installations.
|
Client: Zielińska Jolanta - Warszawa |
Completion: 08.2017-08.2018 |
Improvement of land - separating a warehouse with a wall made of troughed sheet, inclusive of auxiliary works in the building N55 at the plant premises.
|
Client: Pratt&Whitney Rzeszów SA |
Completion: 11.2017-05.2018 |
Expansion of a warehouse and an office and amenity building at the Company’s premises.
|
Client: BIMEX-BÖLLHOFF sp. z o.o. - Krzemienica |
Completion: 07.2017-01.2018 |
Production and warehouse hall.
|
Client: MODEL OPAKOWANIA Sp. z o.o. - Biłgoraj |
Completion: 06.2017-11.2017 |
Extension of a warehouse hall for ABS edging.
|
Client: POLKEMIC Sp. z o.o. - Rzeszów |
Completion: 01.2017-08.2017 |
Extension of REMONDIS by adding a tunnel composting facility.
|
Client: REMONDIS Sp. z o.o. - Warszawa |
Completion: 11.2016-02.2018 |
Construction and repair of facilities of Handlopex.
|
Client: HANDLOPEX SA - Warszawa |
Completion: 08.2016-09.2017 |
Presentation of technologies of manufacture of innovative polystyrene materials with an athermal additive of lowered thermal conductivity coefficient - reinforced concrete works – foundation.
|
Client: SYNTHOS DWORY 7 spółka z ograniczoną odpowiedzialnością - Oświęcim |
Completion: 11.2016-07.2017 |
Construction of industrial buildings and an in-house laboratory.
|
Client: Lesaffre IngredientsServices Polska Sp. z o.o. - Legnica |
Completion: 06.2016-08.2017 |
Extension and alteration of the existing production facilities in Zakład Produkcji i Dystrybucji Leków Sanofi Aventis Sp. z o.o.
|
Client: SANOFI-AVENTIS Sp. z o.o. - Warszawa |
Completion: 07.2016-05.2017 |
Alteration and change of use of the warehouse and garage building into the employee amenities and office building.
|
Client: REMONDIS Sp. z o.o. |
Completion: 03.2016-10.2016 |
Presentation of a technology of production of innovative polystyrene materials at the premises of Synthos Dwory 7 Sp. z o.o. Sp. J.
|
Client: AARSLEFF spółka z ograniczoną odpowiedzialnością - Warszawa |
Completion: 07.2016-08.2016 |
Warehouse hall with a storage reservoir.
|
Client: HANDLOPEX SA - Warszawa |
Completion: 02.2016-08.2016 |
Usługi w ramach budowy układu odsiarczania i odpylania spalin w Elektrociepłowni EC II realizowanej przez BIPROKWAS-Kraków w systemie "pod klucz" na terenie Grupy Azoty S.A.- wykonanie stropów żelbetowych i ścian murowanych.
|
Client: Grupa Azoty Polskie Konsorcjum Chemiczne Sp. z o.o. - Tarnów |
Completion: 04.2016-08.2016 |
Design and execution of building works under the investment project: Construction of a warehouse hall of casting moulds.
|
Client: Zakład Metalurgiczny "WSK Rzeszów" - Rzeszów |
Completion: 12.2015-08.2016 |
Process building "1" under the assignment no. I-0014/019 "A new manufacturing plant of iron-chromium catalyst" at the premises of Grupa Azoty SA in Tarnów - closed-in building.
|
Client: ZWRI Sp. z o.o. Spółka Komandytowa - Tarnów |
Completion: 12.2015-07.2016 |
Extension of a plant of Goodrich Aerospace Poland.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 09.2015-12.2016 |
2011 - ... |
Warehouse hall with breakout and office area with installations and access points.
|
Client: AMB TECH Anna Bury - Rzeszów |
Completion: 11.2014-08.2015 |
Office and warehouse building inclusive of internal systems and improvement of territory (construction of paths, lighting, lawn, etc.)
|
Client: B+B M.Bieńkowski, L.Budkowski spółka jawna - Kraków |
Completion: 06.2014-01.2015 |
Production and warehouse hall with auxiliary facilities - extension.
|
Client: MODEL OPAKOWANIA Sp. z o.o. - Biłgoraj |
Completion: 04.2014-10.2014 |
Production and service building with facilities and external infrastructure.
|
Client: APLISENS S.A. - Warszawa |
Completion: 09.2013-08.2014 |
Construction of the new separate production plant of amorphous precipitated silica at the premises of Anwil.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2013-2014 |
Storage and workshop hall.
|
Client: PPHU "FOX" Dariusz Nizio - Biłgoraj |
Completion: 12.2013-05.2014 |
Office, service and warehouse building with technical infrastructure for BALLUFF Sp. z o.o.
|
Client: PM HOLDING Sp. z o.o. - Wrocław |
Completion: 01.2014-05.2014 |
Reinforced concrete structures of the office and service building with the warehouse hall for Lapp Kabel Sp. z o.o.
|
Client: PM HOLDING Sp. z o.o. - Wrocław |
Completion: 07.2013-01.2014 |
Building works on the premises of Goodrich Aerospace Poland.
|
Client: GOODRICH AEROSPACE POLAND Sp. z o.o. - Krosno |
Completion: 11.2011-12.2016 |
Design and construction of the production and warehouse hall.
|
Client: BURY AUTOMOTIVE Sp. z o.o. - Mielec |
Completion: 01.2013-01.2014 |
APLISENS Pressure Converters Plant, joint stock company.
|
Client: APLISENS S.A. - Warszawa |
Completion: 09.2012-01.2014 |
Alteration and extension of the existing production building on the Company’s premises.
|
Client: SANOFI-AVENTIS Sp. z o.o. - Warszawa |
Completion: 02.2012-01.2013 |
Building works on the premises of the BAUER Printing House.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 02.2012-06.2013 |
Alteration of the H3/H4 warehouse hall inclusive of external works.
|
Client: CONVEX GLASS Sp. z o.o. - Chmielek |
Completion: 12.2012-02.2013 |
Construction of the glycerine based epichlorohydrin production unit in Zakłady Chemiczne ZACHEM SA (ZACHEM Chemical Plant, join stock comp.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 12.2010-04.2012 |
Production and warehouse building, gas boiler house and water treatment works.
|
Client: ZPOiW VORTUMNUS Sp. z o.o - Skołyszyn |
Completion: 03.2011-06.2012 |
Construction of the fermenting hall, transport hall and production base building at the premises of the Production Plant.
|
Client: AMBRA S.A. - Warszawa |
Completion: 07.2012-09.2012 |
Production Plant "Goodrich Aerospace Poland S.A." - steel-reinforced concrete works.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 10.2010-03.2012 |
Building works on the premises of the BDN Printing House.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 02.2012-05.2012 |
Production and warehouse building LENKO S.A. - reinforced concrete works.
|
Client: GRUPA CMP CONSTRUCTION sp. z o.o. - Kraków |
Completion: 07.2011-10.2011 |
Production and warehouse hall in the Scientific and Technological Park (Zone S-2 in Rogoźnica).
|
Client: POLKEMIC II Sp. z o.o. S.K.A - Rzeszów |
Completion: 04.2011-10.2011 |
Metal Articles Warehouse no. 2 with infrastructure.
|
Client: BIMEX-BÖLLHOFF sp. z o.o. - Krzemienica |
Completion: 04.2011-08.2011 |
Production hall with a social and office building - steel-reinforced concrete works.
|
Client: ALURON Sp. z o.o. - Zawiercie |
Completion: 11.2010-09.2011 |
Construction of a warehouse-workshop building with the office part, and construction of a warehouse.
|
Client: WACKER NEUSON Sp. z o.o. - Ożarów Mazowiecki |
Completion: 03.2010-01.2011 |
Construction of filling station for WSK "PZL - Rzeszow" S.A.
|
Client: BDS Instal Sp. z o.o. - Głogów Małopolski |
Completion: 09.2010-01.2011 |
Construction of the production and warehouse hall for COBI. Earthworks, reinforced concrete and masonry works.
|
Client: KORIB Waldemar Karlowicz - Wyszków |
Completion: 06.2010-10.2011 |
Modernisation of production hall and refurbishment of office building.
|
Client: Model Opakowania Sp. z o.o. - Biłgoraj |
Completion: 10.2010-04.2011 |
2006 - 2010 |
Construction of an office-laboratory-production-warehouse building, inclusive of utilities.
|
Client: PH "ELMAT" Sp. z o.o. - Rzeszów |
Completion: 2010 |
Industrial buildings - construction works.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 07.2009-09.2011 |
Renovation and modernization of production halls and accompanying facilities for BRW.
|
Client: BRW Sp. z o.o. - Mielec |
Completion: 2006-06.2011 |
Renovation and modernization of production halls and accompanying facilities for BRW.
|
Client: BLEK-MEBLE Sp.z o.o. - Mielec |
Completion: 2006-06.2011 |
Expansion of a workshop facility in the premises of the Production Plant.
|
Client: "TRAX-BRW" Sp. z o.o. - Przeworsk |
Completion: 2009-2010 |
Construction of a warehouse hall.
|
Client: PPHU "FOX" - Biłgoraj |
Completion: 2009-2010 |
Construction of a warehouse facility.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2009 |
Construction of the warehouse storage and distribution hall.
|
Client: ZPOiW "Vortumnus" Sp. z o.o. - Skołyszyn |
Completion: 2009 |
Refurbishment works in high bay.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2009 |
Construction of H-3.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2008-2009 |
Assembly of a plant network for an ethanol production plant „Goswinowice”.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2007-2009 |
Extension of a production hall in a Manufacturing Plant - II stage.
|
Client: "A&J" Sp.J. H.A. Augustyńscy - Nowy Dwór |
Completion: 2008 |
Extension of warehouse building.
|
Client: PHU "MERKURY" Sp. z o.o - Krosno |
Completion: 2008 |
Extension of warehouse.
|
Client: BLACK RED WHITE S.A. - Bigoraj |
Completion: 2009 |
Renovation and modernization of JARLAN hall.
|
Client: LEAR CORPORATION POLAND Sp. z o.o. - Tychy |
Completion: 2008 |
Earth and foundation works for furniture wholesale outlet.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2007-2008 |
Producing ferroconcrete, steal and construction structures.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2007-2008 |
Construction of FOREST warehouse umbrella roof.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2007 |
Construction of BRWService Center.
|
Client: BRW Sp. z o.o. - Mielec |
Completion: 2006-2007 |
Modification and construction of halls and an administration building.
|
Client: REMONDIS Sp. z o.o. - Warszawa |
Completion: 2005-2007 |
Reinforced concrete foundations for discharge system, safety valves and torches.
|
Client: PETROCHEMIA - BLACHOWNIA S.A. - Kędzierzyn-Koźle |
Completion: 2006 |
Roof construction and coverage at complaint handling department.
|
Client: BLACK RED WHITE S.A. - Biłgoraj |
Completion: 2006 |
Construction of a storage hall no. 2 with a roof.
|
Client: TRANS-BOS Sp. z o.o. - Biłgoraj |
Completion: 2006 |
Reinforced concrete structure for the installation of BT fraction extractive distillation at the petrochemical company of Blachownia SA.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2006 |
Construction of production hall no. 3.
|
Client: CONVEX GLASS Sp. z o.o. - Chmielek |
Completion: 2006 |
2001 - 2005 |
Office, production and warehouse building.
|
Client: FAURECJA sp. z o.o. - Jelcz Laskowice |
Completion: 2005 |
Construction of CRI-VAL Polska plant – stage 1.
|
Client: CRI VAL Polska sp. z o.o. - Jelcz Laskowice |
Completion: 2005 |
Extension of a production hall in a Manufacturing Plant.
|
Client: "A & T" Sp. J. - Nowy Dwór |
Completion: 2005 |
Construction of reinforced concrete structures and brick administration and amenity buildings and production halls.
|
Client: "MIRBUD - PLUS" Sp. z o.o. - Skierniewice |
Completion: 2005 |
Rotogravure printing house BDN Sp. z o.o., a joint stock company.
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2004-2005 |
Refurbishment and modernisation of warehouse and production halls, as well as office and social premises.
|
Client: "TRAX-BRW" Sp. z o.o. - Przeworsk |
Completion: 2004-2006 |
Reinforced concrete constructions in the Paraffin Hydrofining Installation facility in Rafineria Trzebinia S.A. (Rafinery).
|
Client: PROCHEM S.A. - Warszawa |
Completion: 2004-2005 |
Modernization of W-50, W-53, W-54, W-69 department hall in Rzeszow.
|
Client: WSK "PZL - Rzeszów" S. A. |
Completion: 2004 |
Reinforced concrete works at the production hall of “CHIPITA POLAND” Ltd.
|
Client: BALAFAS GROUP K. Balafas Polska Sp. z o.o. - Tomaszów Mazowiecki |
Completion: 2004 |
Construction works for “ALFA” building at Merloni Indesit Polska plant.
|
Client: Firma "JOKA" - Łódź |
Completion: 2004 |
Renovation and modernization of JARLAN hall.
|
Client: LEAR CORPORATION POLAND Sp. z o.o. - Tychy |
Completion: 2004 |
Refurbishment and modernisation of warehouse and production halls, as well as office and social premises.
|
Client: BRW Sp. z o.o. - Mielec |
Completion: 2003-2006 |
Modernization of a production and storage building in ZP-Lezajsk.
|
Client: Zakłady Piwowarskie LEŻAJSK S.A. - Leżajsk |
Completion: 2003 |
Storage and office building with sewage, water and gas connections and wiring.
|
Client: BIMEX - BOLLHOFF Sp. z o.o. - Łańcut |
Completion: 2003 |
Construction of sugar segregation in Cukrownia Ropczyce S.A. (Sugar factory).
|
Client: INSTAL Rzeszów S.A. |
Completion: 2002 |
Extension of "ECHO” Commercial and Service Centre.
|
Client: RE - BAU Sp. z o.o. - Kraków |
Completion: 2001-2002 |
Assembly of flue valves and lights in industrial plants together with installations.
|
Client: GOLDBECK Sp. z o.o. - Poznań |
Completion: 2000-2002 |
Warehouse of Ceramics and Sanitary Facilities with the amenity part.
|
Client: FH BOZ S.A. - Rzeszów |
Completion: 2001 |
Production and storage hall together with the amenity building.
|
Client: ZPP "VALSIR - POLSKA" - Skawina |
Completion: 2000-2001 |
Production hall together with the office and a retaining wall.
|
Client: HTL - STREFA Sp. z o.o. - Ozorków |
Completion: 2000-2001 |
Production hall with the office.
|
Client: POLKEMIC S.C. Zakład Pracy Chronionej - Rzeszów |
Completion: 2000-2001, 2003 |
... - 2000 |
Reinforced concrete works at HERZ plant.
|
Client: RE-BAU Sp. z o.o. - Kraków |
Completion: 2000 |
Production hall of Rupp Ceramics plant.
|
Client: RUPP CERAMIKA - Skrzyńska k/Przysuchy |
Completion: 1999-2000 |
Construction works at the construction of warehouse hall for “FERRO”.
|
Client: TRANSSYSTEM S.A. - Łańcut |
Completion: 1998-1999 |
Reinforced concrete works for Meat Processing Plant.
|
Client: Firma "JOKA" sj Tomaszów Lubelski - Tarnowska Wola |
Completion: 1998-1999 |
"METRO REAL" Commercial Centre – installation of smoke vents and skylights.
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
M LOGISTIC – installation of smoke vents.
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
VW Polkowice – installation of smoke vents and continuous skylights.
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
"METRO REAL MARKET" – installation of smoke vents and dome skylights
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
"REAL Mysłowice" Commercial Centre – installation of smoke vents and skylights.
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
"METRO REAL" Commercial Centre – installation of smoke vents and skylights.
|
Client: POLSERVICE Sp. z o.o. - Warszawa |
Completion: 1998-1999 |
Refurbishment and construction works, plus finishing of the interior of the CHP Plant.
|
Client: WSK "PZL - Rzeszów" S. A. |
Completion: 1996-1997 |